Tiroler Berglandschaft

Self-test

Self-Test: How Ready Is Your Plant for AI?

12 questions, about 10 minutes. Best filled in together with production, quality and planning.

Your answers stay in this browser window.

Nothing is stored or transmitted. If you close or reload the page, the answers are gone.

Prefer paper? Self-test as a PDF to print (German)

0of 12 answered

0 of 24 points so far

The 12 questions

Per question: 0 = does not apply · 1 = partly · 2 = applies

Data

Question 1: For every order, you can trace which machine it ran on and with which settings.

Question 2: Target and actual values from production are available digitally, not just on paper.

Processes

Question 3: The most important processes are documented, and the documentation matches what happens day to day.

Question 4: When one department changes its plans, the departments affected find out the same day.

Knowledge

Question 5: Solutions to earlier breakdowns and complaints can be found without having to ask anyone.

Question 6: When an experienced specialist leaves, their knowledge stays in the company.

Planning

Question 7: Planning knows the actual setup and changeover times.

Question 8: The bottleneck in the plant is known, and planning is built around it.

Quality

Question 9: When there is a complaint, the cause is usually found within a few days.

Question 10: Inspection results flow back to the places that caused the defect.

Energy

Question 11: The energy consumption of the largest equipment is known per order or per unit.

Question 12: Capacity utilization and energy consumption are looked at together.

Your result

0 of 12 answered. 0 of 24 points so far.

The result appears once all 12 questions are answered.

Downloads

To print and pass on. Direct download, no sign-up. Both PDFs are in German.

  • Plant Check on two pages

    What you get, how the day at the plant runs and what it costs.

    PDF (German), 2 pages, 329 KB

    Download PDF
  • Self-test to print

    12 questions with scoring. To fill in together with production, quality and planning.

    PDF (German), 2 pages, 184 KB

    Download PDF

Next step

The self-test shows the direction. The Plant Check shows exactly where to start: one day on site, a report with three concrete starting points.